Confirm
Item, access, disconnection, and price.
Pickup for already disconnected built-in and portable dishwashers. The crew plans around the appliance, floor level, doorway clearance, and loading access.

The appliance must be disconnected from power, water, drain, cabinetry, and countertop fasteners before pickup. Wipe out standing water and keep the route dry.
Never cut a refrigerant line or attempt gas disconnection for removal. Arrange the appropriate qualified service first.

Measure the appliance at its widest point, then measure the narrowest doorway. Note stair width, ceiling height over stairs, tight landings, porch steps, soft ground, and the distance to the truck.
The crew confirms the scope and price before loading. Floors and doorways are approached with the appliance dimensions in mind, then the unit is moved, secured, and routed for appropriate processing.
Item, access, disconnection, and price.
Protect the route and roll the unit out.
Send the appliance to an appropriate facility.
A dishwasher is ready only after the utility and cabinet connections are handled and the remaining water is contained.
Tell us what needs to go, where it sits, and what the path out looks like.